Going forward a substantial portion of their electricity, heat and cooling will be generated at their own site; rather than buying energy from the national grid. The savings have been delivered by a combination of a 100 kilowatt combined heat and power system (CHP) and an 85 kilowatt gas engine VRF heat pump both of which have been provided on the basis that the equipment is owned, operated and maintained by EuroSite Power meaning zero capital outlay for Abbeycroft Leisure.