Crucial in supporting the UK's transition to lower-carbon generation. Demand Side Respond (DSR) is where energy users change their electricity consumption patterns in response to a signal or incentive from the network operator.
The ability to tap into flexibility sources ensures power supply and demand are matched, that the grid is not overloaded and that supplies are at the correct voltage and frequency across the network.
29 April 2024
The second half of RIIO-2, BP2, runs from 1 April 2023 - 31 March 2025.